How a Hard Money Draw Schedule Works: Rehab Draws in Florida

November 26, 2026 · 9 min read · By Onias Derilus, Broker

Rehab money arrives in draws, after an inspector confirms the work. Here is how a draw schedule is built, how to keep it moving, and the Florida lien rules.

A hard money draw schedule is the plan for releasing your renovation money in stages as the work gets done. The lender holds the rehab budget back at closing. Then it pays out each piece after an inspector confirms that phase is finished. A good schedule keeps the crew working and the lender comfortable, while a bad one leaves the job idle while you wait for money. This guide shows how a schedule is built, how a draw request works, and what Florida's construction lien law adds to each payment.

Key takeaways
  • Draws are tied to finished, inspectable work, not to dates on a calendar.
  • You usually pay for a phase first and get reimbursed, so you need cash to carry at least one phase.
  • Each draw can carry an inspection fee and a wait while the lender reviews and wires the money.
  • In Florida, a recorded notice of commencement and lien waivers protect you from paying twice for the same work.
  • Many lenders hold the final draw until the contractor signs a final affidavit and the punch list is done.

What a hard money draw schedule is

Most flip loans have two parts. The purchase money funds at closing. The rehab money stays with the lender in what is called a holdback, and it comes out in draws.

A draw schedule lists each phase of work, what it includes and what it costs. When a phase is done, you ask for a draw. The lender sends an inspector, checks the work against the schedule, and releases the money for that phase. Our guide to fix and flip loans in Florida explains how the purchase and rehab portions fit together.

How a hard money draw schedule is built

It starts with your scope of work. That is a line-by-line list of every repair, with a cost for each line. The lender reviews it during underwriting, often beside your contractor's bid, and may ask for changes before closing.

Next, the lines are grouped into phases that follow the order of a real job. Demolition comes before framing, rough plumbing comes before drywall, and paint comes near the end. Each phase should be something an inspector can see and confirm in one visit.

A sample hard money draw schedule

The budget below is an assumption for illustration only. It is not a real bid or any lender's required format.

DrawWork in the phaseBudget
1Demolition, roof and dry-in$18,000
2Rough plumbing, electrical and air conditioning$20,000
3Impact windows, doors and drywall$17,000
4Kitchen, baths, flooring and paint$20,000
5Fixtures, exterior and punch list$5,000
Total rehab budget$80,000

Five draws is only an example. Some lenders allow more, some fewer, and some release money by line item rather than by phase. Ask how your lender counts it before you sign.

The draw request, step by step

  1. Finish the phase. The work must be installed, not just delivered.
  2. Send the request. Include the phase, the amount, photos, and invoices from the contractor.
  3. Add lien waivers. Collect them from the contractor and any subs paid for that work.
  4. Book the inspection. The lender's inspector visits, or reviews a live video or dated photos.
  5. Get the approval. The lender approves the lines it can confirm and may hold back part of a line that is not finished.
  6. Receive the wire. The money goes to you or straight to the contractor, minus any draw fee.

A complete package moves faster. Missing invoices or blurry photos are the most common reason a draw sits.

Carrying the cost of each phase

Most lenders reimburse rather than advance. So you pay for phase one out of your own cash, then wait for the draw. In the sample above, that means at least $18,000 on hand before any rehab money comes back.

Plan for more than one phase. Inspections can slip, and a contractor may need the next phase's materials before the last draw lands. Also ask whether the lender will fund a deposit on long-lead items such as impact windows, since many lenders draw only on work that is installed. Our guide to what it costs to fix a house helps you size the budget and the cushion.

Line up your contractor's payment terms with the schedule before work starts. A contractor who expects a large deposit up front, or weekly pay regardless of progress, will clash with a lender that pays by phase. Our guide to house flip contractors covers how to agree on terms.

Fees and timing on a hard money draw schedule

Each draw can carry an inspection fee, and some lenders add a processing or wire fee. Five draws at a flat fee add up, so ask for the fee schedule in writing and count it in your budget.

Timing matters as much as cost. Ask how long the lender takes from request to wire, and whether that clock pauses on weekends. A slow lender can stall a crew for a week, which costs you more in holding time than the fee itself.

Also ask how interest works on the holdback. Some lenders charge interest on the full loan from closing, including rehab money still in the holdback. Others charge only on money you have drawn. As an assumption, at 12 percent a year, an $18,000 draw adds $180 a month in interest on the drawn-funds method. Our guide to hard money loan rates shows how the two methods change your total cost.

Florida lien law and your hard money draw schedule

Florida's construction lien law, Chapter 713, lets unpaid contractors, subs and suppliers file a lien on the property they improved. That can happen even when you have paid your general contractor in full. The draw process is how you and your lender make sure every dollar reaches the people who did the work.

Record the mortgage, then the notice of commencement

Before you start an improvement costing more than $2,500, you must record a notice of commencement with the county clerk and post a copy at the job, under section 713.13. The notice names the owner, the contractor and any construction lender. Every Florida building permit carries a warning that skipping it can mean paying twice for the same work. The same warning tells anyone getting a loan to talk to the lender first.

The reason is priority. Under section 713.07, most construction liens take priority from the date the notice of commencement is recorded. A mortgage recorded before that keeps its place, along with money it pays out later. That is why lenders and title companies want the mortgage recorded first.

Notices to owner

Subs and suppliers who did not sign a contract with you must send you a notice to owner to keep their lien rights. They must serve it before they start, or within 45 days of starting, under section 713.06. Keep every notice you receive. It tells you who else expects to be paid out of each draw.

Lien waivers with every draw

When you pay for a phase, get a written waiver from the contractor and from each sub or supplier who sent a notice. Section 713.20 sets out a standard form for a waiver on a progress payment. It also says a lien right cannot be waived in advance, so each waiver covers only the work and the amount paid through a stated date.

The final payment

Before the last payment, the contractor gives you a final affidavit. It states that the lienors on the job have been paid, or names any who have not. Many lenders hold the final draw until they have it, along with final waivers. Treat that as protection, not red tape.

Lender inspections are not permit inspections

The lender's inspector checks one thing: whether the work in a phase is done, so money can be released. The building department checks whether the work meets code. Passing one does not mean you passed the other.

Schedule permit inspections as the work moves, and close every permit before you list. Buyers, their lenders and title companies look for open permits, and an open one can delay or kill a sale. Florida's owner-builder exemption also does not cover a house you are fixing to sell, so most flips need licensed contractors. Our post on whether you can flip houses without a license explains that rule.

Common problems with a hard money draw schedule

  • A front-loaded budget. Lenders will not release more than the value of the work in place, so inflating early lines does not speed up the money.
  • Materials on site but not installed. Cabinets in the garage usually do not count until they are on the wall.
  • Thin draw packages. Missing invoices, waivers or photos send a request back to the start.
  • No contingency. Without a cushion line, the first surprise behind a wall comes out of your pocket.
  • Work done out of order. Finishing paint before the electrical inspection makes the inspector's job harder and can mean redoing work.

Changing a hard money draw schedule mid-job

Plans change once the walls are open. If one line runs over and another comes in under, ask the lender to move money between them before you spend it. Most lenders will consider a written change order with a revised budget. But they rarely raise the total loan, so any overrun past the holdback is yours to cover.

The last draw and the sale

The final draw often lines up with the punch list, the final permit inspections and the photos for the listing. Plan the launch as the last phase starts, not after it ends. Every week the house sits finished but unlisted costs a week of interest.

Price it from closed sales of renovated homes. A home value estimate gives you a first read, and our market reports show how fast homes are selling in your area. Then run your profit with the home sale calculator, including the loan payoff and selling costs. A Pure Equity listing agent can time the launch around your maturity date in West Palm Beach, Riviera Beach or Homestead.

At closing, the buyer's title company searches for recorded liens and the notice of commencement. Final waivers and the contractor's affidavit help it clear title quickly. Our guide to selling a house with a lien explains what happens if one turns up. If your buyers are likely to use FHA loans, note FHA's 90-day resale rule, which our fix and flip guide covers.

For a term sheet with draw terms you can review before you buy, Mortgage Capital keeps an overview on its hard money loan page.

Planning a rehab? Get a term sheet that spells out the draw process, then let a Pure Equity agent check the resale comps before you lock in the budget.

Get a fix-and-flip term sheet or see what a finished flip could sell for.

Frequently asked questions

How many draws does a hard money draw schedule have?

It depends on the lender and the size of the job. A light cosmetic flip may need two or three, while a full gut job may need more. Ask before closing, since each draw can carry a fee.

How long does a draw take?

It varies by lender. The clock covers booking the inspection, reviewing the package and sending the wire, so ask for the lender's usual turnaround in writing.

Can the lender pay my contractor directly?

Many lenders can, and some prefer it. Direct payment keeps the money moving, but still collect a lien waiver for every payment.

What if the inspector says a phase is not finished?

The lender may release part of the draw for the lines that are done and hold the rest. Finish the open items, then ask for a follow-up inspection.

Am I charged interest on money not yet drawn?

That depends on the loan. Some lenders charge on the full loan from day one, and others charge only on funds drawn. Get the answer in writing.

Related reading

Sources

Onias Derilus

About the author

Onias Derilus

Broker · Florida Real Estate Broker · FL License BK3276618

Reviewed and published by the Pure Equity team, led by broker Onias Derilus. We help clients buy, sell, rent, and invest across South Florida's eight counties. Meet the team.

Talk to an Expert

Our team is happy to answer any questions this article raised, or give you a personalized take on your specific situation. No pressure, no pitch.